- FOUNDATIONS: They are dug in the natural land. After the pose of the ferraillage
one comes to sink the concrete. General measurements of the foundations 40x50
cm.
2
- SANITARY EMPTINESS: It went up on the foundations, it has a height of
60 cm. It is achieved with agglos of 50x20 cm. Confined ceramic claustras are
arranged on the walls of the Sanitary emptiness for ventilation.
3
- FLOOR: It is put on the sanitary emptiness. It is composed of girders
of reinforced concrete and hourdis in insulating polystyrene. A welded lattice
is then put on, a tile is flowed. The finished floor with the tiling has a thickness
of 28 cm.
IMPLANTATION
- TERRACING: The project that was the subject of an implantation plan
by the office of survey, is implanted then by the driver of works. The foundations
are dug then in the natural land. After the pose of the ferraillage one comes
to sink the concrete. General measurements of the foundations are 40x50 cm.
4
- ELEVATION OF THE WALLS: They are achieved in agglos of 50x20 cm. The lintels
and a peripheral chaining finish the all.