1 - FOUNDATIONS: They are dug in the natural land. After the pose of the ferraillage one comes to sink the concrete. General measurements of the foundations 40x50 cm.
2 - SANITARY EMPTINESS: It went up on the foundations, it has a height of 60 cm. It is achieved with agglos of 50x20 cm. Confined ceramic claustras are arranged on the walls of the Sanitary emptiness for ventilation.
3 - FLOOR: It is put on the sanitary emptiness. It is composed of girders of reinforced concrete and hourdis in insulating polystyrene. A welded lattice is then put on, a tile is flowed. The finished floor with the tiling has a thickness of 28 cm.

IMPLANTATION - TERRACING: The project that was the subject of an implantation plan by the office of survey, is implanted then by the driver of works. The foundations are dug then in the natural land. After the pose of the ferraillage one comes to sink the concrete. General measurements of the foundations are 40x50 cm.

4 - ELEVATION OF THE WALLS: They are achieved in agglos of 50x20 cm. The lintels and a peripheral chaining finish the all.